Strength
Splitting of paving blocks (PN-EN 1338, thickness factor k, F ≥ 250 N/mm), bending of slabs and kerbs, compression of blocks. Average, minimum, deviation, wearing layer — errors shown in red right away.
For precast concrete plants · ZKP
UZYTAK Lab Beton handles factory production control for paving blocks, slabs, curbs, gutters, blocks and road slabs. The lab technician enters the breaking force and dimensions — the program calculates strength according to the standard, watches the limits, draws a Shewhart chart and prepares a report with a QR code.
From 1 to 10 workstations via NAS, even without internet.Try it yourself
This is what a test looks like that a lab technician does every day. Check "cement from a faulty delivery" and see how the Shewhart chart catches the problem.
What the program does
The modules match what a lab technician does every day — from the press to the ZKP audit.
Splitting of paving blocks (PN-EN 1338, thickness factor k, F ≥ 250 N/mm), bending of slabs and kerbs, compression of blocks. Average, minimum, deviation, wearing layer — errors shown in red right away.
Standard line, CL and ±3σ limits. An alarm sounds when a batch falls below the standard, goes outside the limits, or when 7 batches in a row are below the center line.
Wet and dry mass, Wa and average, limits for each product type. The result is visible right away with the batch and in the report — no retyping.
After 3–14 days the program shows what the strength will be after 28 days. A weak batch stays in the yard before it reaches the customer.
PN-EN 933-1: fines, fineness modulus, mass balance, limit curves, comparison of several aggregates and a blend on one chart.
Lab notes, a test schedule created automatically from production dates, and reminders from the Windows system tray.
Product families, dimensions, standard limits and project requirements. You enter your own calculation formula yourself — no programmer needed.
A PDF report with the Shewhart chart, a pallet label with a QR code (a phone shows the batch results), and export of everything to Excel.
Each computer also works without a network. Background synchronization, merging by record version — no result is ever lost.
This is how it looks
Why Lab Beton
You learn about a problem with the cement or the recipe three weeks earlier. The batch doesn't go out to the customer and come back as a complaint.
The site manager or inspector scans the code with a phone and sees the batch results — no internet and no login.
We don't write a program from scratch over several months. We adapt a working program to your plant in 2–4 weeks.
Data stays on your computers and network drive. You pay once for the license.
Prices
Prices are net. Payment for the implementation after you accept the working program.
How we implement
We show you the program online using your own examples. We review your reports, spreadsheets and your customers' requirements.
You receive a fixed price and deadline in writing — no hourly billing.
Product range, templates, documents, historical data, workstations and NAS. You see progress on a working version.
Your lab technicians work from day one. You pay after acceptance, and we stay available by phone.
Who is behind it
20 apps on Google Play and programs for Windows. We are a young company, which is why our reputation matters most to us.
Standards, ZKP and laboratory work are not theory for us — we know them from production.
6 months of free fixes. You pay for the implementation only once the program works at your site.
UZYTAK · since 2021. VAT invoice, contract and clear terms.
Questions
Yes. As part of the implementation, we transfer the test history from your spreadsheets so that the Shewhart chart and trends work from day one.
No. Each workstation works on its own copy of the data, and synchronization happens through a network drive (NAS) at your plant.
The license covers 4 workstations, and each additional one costs 235 €. The program works well on 1–10 computers.
You can change the template for each product in the program, and mark stricter investor requirements for a batch.
The data stays with you. Backups are in the data folder and on the NAS, and export to Excel is always available.
Yes — the online demo takes 30 minutes and is free. We can also come to your plant.
Start with a demo